beat the summer heat

The summer in Brisbane is at its peak starting during the latter days of November, going through December, January, February and ending around the first to the second week of March; the humidity and the rays are at their all-time peak. It becomes unbearable in certain places as people cannot survive without air conditioning in Brisbane Northside. The A/C has become a hot-selling commodity in all of Brisbane due to its scorching heat of 40-46 celsius most of the days in a year.

Before installing an air conditioning system in Brisbane, try to understand what processes are involved in analyzing and assembling the entire system. The main reason to understand this is to give the consumer the power not to be oblivious to what the installation team is doing, as many people are unfaithful at what they do.

On the contrary, many great A/C installation teams have the expertise for home spaces and specialize in commercial spaces, who will try to help clients understand the whole process.

 Steps in Air conditioning installation- a quick run-through:

  • Assessment of the previous system: Before installing the A/C system, there are many things to do as per the checklist to assess the entire situation before they can install a new one. If there was an old system pre-installed, they must make sure they understand the system used and if it is being replaced.

The air conditioning in Brisbane Northside and Southside are very particular with the quality of their air conditioning; hence the service provider is extremely considerate with their assessment and ensures complete safety of the surroundings and ensures cleaning post-installation to uphold the quality of service.

  • Installation of the system: Post removal of the old A/C system, the new one is fit in place, keeping in mind the electrical unit and the cooling pipes that must be coupled with the brand new air conditioner. If the wiring and piping are old, there could be a safety risk and must be replaced immediately before installing the new one. After the modifications, the new unit is installed and tested right before the client to ensure it works safely and is sound.
  • Thermostat installation: The thermostat is an important part of most new air conditioning units. It helps keep the temperature in check and helps maintain a comfortable temperature inside the room compared to the outside environment’s temperature.

If there is a requirement for a new thermostat, the service engineers will install one, but if there is a pre-existing thermostat from the old unit which still functions well, they will go ahead and connect that to the new unit to save the client’s money.

  • Final Testing and Maintenance Recommendation: After the basic installation and testing are completed, the service engineers will do a final check of all working units, both electrical and plumbing, that allow quick cooling of the A/C unit. Once they get the signal, they call the client to help them understand the unit’s operation, what functions can be used and what situations to avoid.

In case the clients have any further questions, they will answer them to educate them, allowing them to operate it without any fear in their minds. They also let the customer know the various maintenance tips that can help increase the lifespan of the A/C unit.

If there are any issues with the installation process or maintenance terms, always reach out to the service representative, as they are present to provide a satisfactory customer experience.